PawNavigator – GPS Tracking Collar for Adventurous Cats
Free US Shipping
ENHANCED SAFETY & LIBERTY FOR ADVENTUROUS CATS
Ensure your feline friend stays safe and connected during their outdoor escapades with the PawNavigator GPS tracking collar. Engineered for daily comfort and safety, its lightweight and adjustable design allows your cat to explore the great outdoors while giving you peace of mind.
WHY CHOOSE PAWNAVIGATOR?
- GPS tracking technology ensures easy location monitoring for outdoor adventures
- Adjustable collar design promotes comfort for all-day wear
- Constructed with durable, pet-safe materials to withstand the energy of playful cats
- Perfect for outdoor exploration, travel, yard play, and daily pet monitoring
PRODUCT SPECIFICATIONS
- Material: Sturdy nylon collar paired with a lightweight tracking unit
- Features: GPS tracking capability, adjustable design for maximum comfort
- Size: 2 cm × 2 cm
- Ideal for: Outdoor cats, travel adventures, backyard exploration, and daily monitoring
WHAT'S INCLUDED?
- 1 × PAWNAVIGATOR GPS Collar
Frequently asked questions
Quick answers about ordering from Couje. More detail on our full FAQ page.
How much does shipping cost, and how long does it take?
Shipping is free on every order — no minimum. Orders are typically delivered within 4–12 business days (processing included), and every order includes tracking. Full details are in our Shipping Policy.
What is your return policy?
You can return items within 30 days of delivery. Once your return is received and inspected, we process your refund to the original payment method. See our Return & Refund Policy for the full process.
How do I track my order?
As soon as your order ships, we email you a tracking number. You can follow your delivery at any time on our Track Your Order page.
How can I reach customer service?
Email us at support@couje.com or use our contact form. Our team is available Monday – Friday: 09:00 AM – 05:00 PM EST and replies within 24 hours. Saturday – Sunday: closed.
